Client – Arcadia Group
Main Contractor – ISG
Architect – Sheppard Robson
Consultant – TB&A
Programme Duration - Sep 2013 – Present
Value – £10.6M
Area – 12,452M²
Phoenix have been appointed to carry out the services fit out for Arcadia’s Head office at Oxford Street. Works consist of Electrical , Mechanical and Public Health services which includes ownership of BMS, Fire Alarm and Sprinkler installations. The building is located above a Live shopping centre which occupies Levels Grd – 1st with Arcadia’s demise consist of Part Basement level, Grd floor receptions, levels 2-6 and Part roof. Arcadia currently have staff occupying Levels 3-5 whilst the fit out of the Basement, Core 1 ( grd – 6th Floor), 2nd floor, 6th floor and Roof are fitted out with new services and Plant which consist of the following :

Generator works, LV Distribution, Lighting, LV Power, Uninterruptable Power Supply, Earthing/bonding, Fire Alarm incl disabled facilities, Lighting Protection, Leak detection & Trac Heating, BMS, Rainwater, Drainage, Gas, Domestic Services, General office supply & extract ventilation, Fire rated Smoke extract ventilation from the shopping centre, Toilet Extract, Kitchen Ventilation, Natural gas, LTHW, VRF System, DX Split systems, AHU’s, Packaged Plant rooms, Sprinklers and Dry Risers.

Phoenix are the lead co-ordinator on the project and are responsible for producing fully working coordinated drawings for all the above services , including new riser works which pass both through the shopping centre and occupied Arcadia floors. As well as co-ordinating old plant with new in both the roof and basement areas.

Phoenix are also working very closely with ISG, Arcadia and the Plaza Shopping Centre teams to ensure the existing occupants are not affected by any installation works, Major Plant shutdowns and the migration of old services to new.

On completion of the above the Arcadia occupants on Level 5 will move to Levels 2 & 6 to allow the strip out and fit out works to commence on level 5 with the process repeating for the remaining floors, this is a live project and runs until July 2015.