Client – BBC
Main Contractor – Lend Lease
Architect – Sheppard Robson
Consultant – AECOM
Programme Duration - Dec 08 – Dec 10
Value – £22M
Area – 40,000M²
Phoenix was appointed by Lend Lease and The BBC for the fit-out of their head office.The project involved the new build of phase 2 of the BBC main radio and news broadcast office.

    These activities consisted of;

  • Installation of HV/LV package substations within the basement and roof areas.
  • LV and HV cabling
  • Interlinking 6300amp busbar systems
  • Main LV busbar
  • Installation of LV switchgear and PDU’s
  • Installation of UPS systems
  • G59 wiring and LV switchpanels to generator panels
  • Installation of main comms and SER rooms
  • Specialist lighting and power to News 24 level which consists of News 24 studio, production suites, edit suites, recording suites and main production area
  • Front of house including reception specialist lighting
  • Specialist external lighting including Cyclorama and The World
  • Installation of lighting control system.
  • System earthing and bonding
  • Installation of Mechanical plant power wiring
  • Smoke ventilation