Client – Confidential
Main Contractor – Phoenix
Architect – NWA
Consultant – Houseman Henderson
Programme Duration - 44 Weeks (January 2012 – November 2012)
Value – £18M
Area – 8,000M²
Phoenix were appointed as  the principal contractor, responsible for the full Design and Build and the Construction of a 7 storey building which was located between two existing buildings. The new building housed new Generators, MV and LV switch panels and associated services. New Chillers were added to the roof on one of the existing buildings which required full structural strengthening.
Two floors in the existing building were stripped out and fully fitted out as Data Halls.
The other ten floors in the building were occupied and all existing services were maintained throughout the project. A new incoming MV supply substation was built under the DLR and new bulk fuel tanks were housed in an external compound.
Within the data halls we installed new PDU’s, Cooling CRACs, fire protection, water mist, new UPS system were installed in new rooms and ventilation and humidification systems were added in addition to the new power and lighting systems. A full BMS/PMS and EMS were installed to control the Generators and Power management.