Client – Amazon
Main Contractor – BW Interiors
Architect – AI Architects
Consultant – YES Engineering
Programme Duration – Sep 2013 – Present
Value – £7M
Area – 17,000M²
Phoenix have been appointed to carry out the Cat B Fit-Out for Amazon’s new London head office. Works consisted of the electrical, mechanical and public health services over 11 floors, with additional plant space on the roof and basement levels.

All co-ordination drawings were produced on site and approval given via workshops with the professional team.
Services consisted of extension to the LV system, new dedicated UPS system and CRAC units serving MDF & IDF rooms, high and low level power track installation serving fan coils with LTHW heater batteries, fully addressable Simmtronic lighting control system and specialist feature lighting.

Installation of new Advanced Air fan coil units served by new chilled water installation, and the relocation of existing FCU’s, new supply air and extract air system. Installation of public health tea points on all levels west and east sides.

Flushing and commissioning was via a temporary floor mounted pumps. All electrical testing and commissioning was undertaken by Phoenix JIB approved operatives.