Works consisted of the electrical, mechanical and public health services over 20 floors which is split into 3 phases. We are also appointed as lead Co-ordinator on the project with all co-ordination drawings are drawn in 3D via extensive surveys of existing services and building structure.
The MEP Services consist of new Containment, LV system, UPS systems serving Traders floors, Modular wiring system serving 10,900 new Lights & Specialist Lights, BMS backbone wiring, Energy monitoring system, Leak Detection, Small Power, Earthing & Bonding, Submains and Tap offs, Distribution Boards, PDU’s, 54no AHU refurbishments, 1600 VAV Units, Supply & Extract ductwork distribution system, miscellaneous fans, FCU’s, CRAC Units, CHW Pipework, Domestic Pipework, Drainage Pipework, Gas pipe Work, DX Pipework, Water Heaters, Calorifiers, Overdoor Heaters, Pumps, Sump Pumps, Trench Heating, Testing & Commissioning, Air quality Testing and Heat Load Testing.
The above serves a variety of areas within the buildings which consist of specialist floors, standard floors, Traders floors, Exposed Services areas, SER & MER Rooms, Auditorium, Kitchens & Pantry’s, Refreshment hubs, Receptions, Toilets, Showers, Business Gardens, Multi faith rooms, Plantrooms & Risers and Lift Lobbies.
The Phases are split into the Following:
- Phase 2 – Ground Floor (TCC), Level 1 (TCC), Level 3 and Level 8.
- Phase 3 – Levels 4, 5, 6 & 7
- Phase 4 – Basement 1 & 2, Ground Floor (OCS), Level 1 (OCS), Level 2, Level 9, Level 10 and Levels 11-19 (OCS) upper stack works.
Value: £40M
Scope: M&E
Completion: Ongoing