KCL Bush House

We were appointed to work closely with the Client and design team to enable a swift transition from stage E to F. Early engagement was crucial to achieve the fast track program dates.

The initial emphasis of the works was to upgrade the buildings Infrastructure throughout the Aldwych quarter therefore future proofing all floors to allow greater occupancy for years to come.

These services included new essential rising Bus bar, new ventilation network including chilled & heating pipework, resilient structured cabling network, with communication Rooms fitted out on every floor of AQ including UPS systems, lighting/power, DX cooling and modifications to Fire, Security/access control and BMS systems.

This Fit Out project involved the Cat B MEP fit out of three 9 storey buildings including Heating, Cooling, Lighting, lighting control & Small power to General use study spaced, Specialist lecture theatres, an Auditorium, general open learning spaces, Kitchens,  Café, Shop, Exhibition spaces and ongoing works to the Student union bar and exhibition spaces. KCL Design Team and Phoenix ME worked closely to plan, develop and implement the works to the highest quality and delivery against a challenging timeframe.

Value: £14.3M

Scope: M&E

Completion: Jul 2018